5/29/2025 0 Comments Update: New Nursery Well Underway Here's the new nursery, well along as of mid-May. Concrete block walls up, posts and beams going in. It includes 2 bedrooms for new-arrival-quarantines, 2 group rooms looking onto the connected lush enclosure, kitchen and storage room, and a multi-purpose room. The old nursery was demolished and the site cleared in December, and it didn't take long. Materials - which can have quite a lead time - were ordered in January: concrete blocks for walls; cement, gravel, sand and rebar for concrete pillars and beams; more rebar for mesh panels. And they all arrived. Yes, we cut and weld our own rebar panels, treat them with an anti-corrosive, then paint with forest green. Once installed, these panels will provide both airflow and safety for the little ones, and become a climbing feature as they gain strength and confidence. Stay tuned!